logo

Our Prices

Special Standard Bathroom Renovation Package: $15,000

Listed below are the standard package inclusions:

Demolition

We will remove your existing bathroom fixtures. Shower screens, Vanity Unit, Bathtub, existing taps etc. We will remove existing ceramic tiles and wall sheeting underneath ceramic tiles.

We will remove floor tiles and vacuum and clean any debris.

Structure Fixing

We will replace any water damaged timber in walls and flooring.

Plumbing and Drainage

We will modify existing plumbing and drainage to suit new plumbing design, we will install shower mixers body into the wall.

Electrical

We will pre-wire  electrical cables for power points and lights.

Wall Sheeting

We will use villa board to cover walls and ceramic tiles underlay on timber floors before waterproofing.

Waterproofing

We will prepare floor and walls for waterproofing, and apply polyurethane waterproofing material.

Tiling

Our tiler will be in to start placing bedding sand on the floor and continue with the tiling job. We will bring samples of tiles for your selection.

Vanity Unit

After the tiling job is completed, we will install a client approved vanity unit from the list below:

Shower Screens

Our shower screen supplying company will measure shower screens for custom built manufacturing processes.

Painting

We will repaint the complete interior of the bathroom.